Get an attractive offer for a prospective job where can apply acquired and scientific knowledge, mathematics and ingenuity to develop solutions for technical problems, and where could apply engineering concepts for the work optimization to achieve better maintainability and reliability.
Job Experience
Oct-2012 – 24-12-2012 “EnerTech” LLP for TOZZI
Agip KCO – Kashagan Development Experimental Program
Caspian Sea Project – D Island
Hook-Up Project, Engineering Department
Position: EIT Field Engineer
Responsibilities:Preparing Red Line Mark Up drawing as per site modifications of Layouts, Termination & Block diagrams, Single Line Diagrams, Interconnecting Wiring diagrams, Loop diagrams and Cable Lists for Electrical and Instrumentation disciplines. Furthermore modifications of Vendor drawings such as Schematic Diagrams, General arrangements & Loop Diagrams. Creating Job Cards for EIT works.
10-Aug-2011 – 01-Jul-2012 “Kazakhstan Caspian Offshore Industries” LLP for TOZZI
Agip KCO – Kashagan Development Experimental Program
Caspian Sea Project – D Island
Hook-Up Project, Engineering Department
Position: EIT Field Engineer
Responsibilities: To ensure the issue of technical documents necessary for purchasing electrical and instrumentation bulk materials. Analyzing and defining installation methods of lighting, grounding, electrical tracing, cathodic protection systems. To define the best position of electrical generation and distribution equipment in the plant layout, by optimizing the installation simplicity against company documentation. To define the best cables path by cooperating with the piping unit in implementing the 3D model and according documentation provided by Client. According to Client drawings and construction as-is status, prepare Red Mark-Up drawings and any kind of technical documentation that is required to field supervisors to complete the job on the field. Issue electrical cables and bulk material MTO Top UPS in accordance with the project schedule and needs. To develop executive standards for the installation of above indicated electrical equipment and systems. Arranging the subdivision in subsystems as well as the check lists for instruments, electrical and telecommunication equipments and systems. Cooperating in preparing final project documents as to disciplines pertaining to him.
23-May-2011 – 4-Aug-2011 “Kastador” LLP, Atyrau
Project Designing, Piping Department
Project: Atyrau Valve Plant
Client: Chevron LLP
Position:PipingDesign Engineer
Responsibilities:Detaileddrawingof equipments of sanitary facilities, pipeline connection details, etc. Developing of graphical and text parts part of drawings. Developing of detailed and isometric drawings. Issuing of drawings for internal review. Issuing drawings for review/approval to Client. Processing of comments of Client: graphical or/and text part of drawings. Processing comments for Data Sheets of equipments. Making calculations of water consumption. Calculating the optimal height of pipe ell to prevent cavitating effect occurring. Making calculations of pressure in pipelines of water supply and fire proofing systems inside and outside of production buildings, sewage system pipeline slope inside and outside of production buildings, also during choosing material and type of those pipelines. Preparing technical requirements to Design Civil Department. Weekly visiting of site for monitoring construction processes and to take control performance of technical requirements. Submitting weekly reports of the work done.
Responsibilities:Analyses and comparison details as per drawings and cable schedules on site. Making Red Line Drawings for secondary cable routing in compliance with other disciplines affecting current work, calculating scope of work and preparing FMRs for the equipments and materials for it. Preparing design drawings for the works in forward. Preparing daily, weekly and monthly reports, also MTOs (material take off) list for each areas. Giving instruction to supervisors and foremen regarding performing any given works. Close co-operation with other departments such as Project Control, Cost Control, Procurement, HSE, HR and DCC.
AGIP – Kashagan - Caspian Sea Project - Eskene West
Project: E&I works for OGS(oil, gas & sulphur) Areas
Construction Department
Position: E&IField Engineer
Responsibilities:Analyses and comparison of details as per drawings and cable schedules on site. Calculating scope of works, i.e. materials, manpower, time. Monitoring and control work processes performed by subcontractors in accordance with daily reports and design documentation. Making requests and providing required materials as per FMR(field material requisition), preparation of technical queries for the development and revision of design drawings with client’s approval.
Responsibilities:Monitoring and inspection of erection and operations of drilling derricks, also inspection of operating conditions of drilling equipments including rotating and revolving parts/units, roller chain and belt drive transmissions of drilling equipments, monitoring of derrick alignment works. Control and monitoring the operating condition of hydraulic and overhead drilling equipment lines. Monitoring and inspection of technical/operating conditions of drill pumps and high pressure compressors (manifold lines). Drawing up lists and acts of deficiency for replacement of mechanical parts of drilling equipments and derricks.
01-Feb-2007 – 01-Apr-2007“KazTransCom”, Atyrau
Position: Engineer 9th grade
Responsibilities:Maintenance of computers and office equipments of subsidiary production units of “KazMunaiGaz” corporation. Drawing up a statement of executed work, furthermore if it is necessary maintenance of servers and ATS.
01-Sep-2006 – 25-Jan-2007ATF Bank, Atyrau
Position: Credit Expert
Responsibilities:Attracting new clients, reviewing application, proposing new projects for senior management. Primary workplace gain was to achieve team success despite in the face of stressful situations. Escorting bank operations.
Education
2001 – 2002Kazakh Economic University of T.Ryskulov, Almaty
Accounting & Audit Department
Major in Information Science
2002 – 2006International Academy of Business (IAB), Almaty
Information Technology Department
Major in Information Science
Graduate thesis rated excellent: “Development of simulation program of catalyst processes for oil treatment”
04.2007 – 12.2007EF International language School, Boston, MA, US