Job Description : Conveyor Band Line MontageSection-Division–Position : TECHNICAL OFFICE CHIEF - BUSINESS ADMINISTRATOR
Job Description : Cost Control, Revision Drawing- Planning & Reporting-QA-QC Documentation
Inspection of storage tanks and pipelines according to API 653, API650, ASME B31.1/3, and Client specifications.
Responsible of managing quality inspectors and NDE Teams
Piping Inspection ,Storage Tank Inspection
Preparing of Inspection Test Plans
Inspection of welded pressure vessels according to ASME Standards
Inspection of welded steel construction products
Inspection of industrial equipments and product control such as pumps, valves, flanges and other fittings.
Dimensional Control
Sand blasting and painting controls
2012 Kardemir 50Mw Power Plant Project
Karabuk /TURKEY
|
Section-Division–Position : QA-QC SUPERVISOR
Job Description :Preparing to Test Packages
Application and Control of Hydro Tests on the site
Follow-up and application standards of test
Line checks and walk down after the Hydro Test
Mechanical inspections and reporting
Follow-up welding and piping standards on the site
Application, revision and inspection on mechanical and piping works
Witness Welder qualification Tests
Control and reporting Mechanical and piping Inspection Test Records.
Pipe line check and closing of test packets (Punchs and RT-MT-PT-Hardness Test-heat treatment works and reports
2012 Bis Energy Power Plant Project
Bursa /TURKEY
|
Section-Division–Position : QA-QC SUPERVISOR
Job Description :1 Piece 48 MW Turbo Gas Turbine (GE LM600) assembly and erection the gas line.
ASME B31.3 Process Piping
Simple Cycle, to the diffuser and diverter assembly.
2 x HRSG erection and process piping.
Hydrostatic test preparation and testing. Construction of Pipe rack mounting and piping.
1 x Steam Turbine assembly and process piping ( BOP )
Manufacture of steel construction projects.
WPS, WPQR preparation and application procedures.
Assessment of implementation of NDT (RT, UT, PT, MPI)
1 Piece Gas Turbine, Steam Turbine, 2 x HRSG commissioning.
Steel Construction projects, the implementation of the field.
2012 Bosen Energy Power Plant Revision
Bursa/TURKEY
|
Section-Division–Position : QA-QC SUPERVISOR
Job Description : Pipeline and steam Turbine Revision
Mechanical inspections and reporting
Air pipes blinding inspections.
Assessment of implementation of NDT (RT, UT, PT, MPI)
2011- 2012 Eren Energy Power Plant 160Mw Unit Revision
Çatalağzı/TURKEY
|
Section-Division–Position : QA-QC SUPERVISOR
Job Description : Coal Bunkers & Super Heater Revision
Mechanical inspections and reporting
Air pipes blinding inspections.
Chain conveyors demontage montage control
Tons & 1000 tons Coal bunkers demontage montage control
Stainless steel montage to coal bunkers
Assessment of implementation of NDT (RT, UT, PT, MPI)
2010- 2011 Eren Energy Power PlantProject 2x600 Mw
Çatalağzı/TURKEY
|
Section-Division–Position : QA-QC SUPERVISOR
Job Description : Conveyor Band Line Montage
Mechanical inspections and reporting
LANGUAGE SKILLS:
English;Upperİntermediate (Reading, Listening, Speaking, Writing)
CONTACT:
Date: 2016-03-03; view: 919
|