![]() CATEGORIES: BiologyChemistryConstructionCultureEcologyEconomyElectronicsFinanceGeographyHistoryInformaticsLawMathematicsMechanicsMedicineOtherPedagogyPhilosophyPhysicsPolicyPsychologySociologySportTourism |
Job Description : Conveyor Band Line MontageSection-Division–Position : TECHNICAL OFFICE CHIEF - BUSINESS ADMINISTRATOR Job Description : Cost Control, Revision Drawing- Planning & Reporting-QA-QC Documentation Inspection of storage tanks and pipelines according to API 653, API650, ASME B31.1/3, and Client specifications. Responsible of managing quality inspectors and NDE Teams Piping Inspection ,Storage Tank Inspection Preparing of Inspection Test Plans Inspection of welded pressure vessels according to ASME Standards Inspection of welded steel construction products Inspection of industrial equipments and product control such as pumps, valves, flanges and other fittings. Dimensional Control Sand blasting and painting controls
Section-Division–Position : QA-QC SUPERVISOR Job Description :Preparing to Test Packages Application and Control of Hydro Tests on the site Follow-up and application standards of test Line checks and walk down after the Hydro Test Mechanical inspections and reporting Follow-up welding and piping standards on the site Application, revision and inspection on mechanical and piping works Witness Welder qualification Tests Control and reporting Mechanical and piping Inspection Test Records.
Pipe line check and closing of test packets (Punchs and RT-MT-PT-Hardness Test-heat treatment works and reports
Section-Division–Position : QA-QC SUPERVISOR Job Description :1 Piece 48 MW Turbo Gas Turbine (GE LM600) assembly and erection the gas line. ASME B31.3 Process Piping Simple Cycle, to the diffuser and diverter assembly. 2 x HRSG erection and process piping. Hydrostatic test preparation and testing.
Section-Division–Position : QA-QC SUPERVISOR Job Description : Pipeline and steam Turbine Revision Mechanical inspections and reporting Air pipes blinding inspections. Assessment of implementation of NDT (RT, UT, PT, MPI)
Section-Division–Position : QA-QC SUPERVISOR Job Description : Coal Bunkers & Super Heater Revision Mechanical inspections and reporting Air pipes blinding inspections. Chain conveyors demontage montage control Tons & 1000 tons Coal bunkers demontage montage control Stainless steel montage to coal bunkers Assessment of implementation of NDT (RT, UT, PT, MPI)
Section-Division–Position : QA-QC SUPERVISOR Job Description : Conveyor Band Line Montage Mechanical inspections and reporting
LANGUAGE SKILLS: English;Upperİntermediate (Reading, Listening, Speaking, Writing)
CONTACT: Date: 2016-03-03; view: 1014
|