Requirements Management Plan

 

<Insert Project Logo here>

 

 

<Month, Year>

 

 

Health and Human Services Agency, Office of Systems Integration

 


Revision History

Revision History
Revision/WorkSite # Date of Release Owner Summary of Changes
OSI Admin #10935 10/28/2010 OSI - PMO Initial Release
       

Remove template revision history and insert Project Staff Management Plan revision history.

 

Template Instructions:

This template offers instructions, sample language, boilerplate language, and hyperlinks written in 12-point Arial font and distinguished by color, brackets, and italics as shown below:

· Instructions for using this template are written in purple-bracketed text and describe how to complete this document. Delete instructions from the final version of this plan.

· Sample language is written in red italic font and may be used, or modified, for completing sections of the plan. All red text should be replaced with project-specific information and the font changed to non-italicized black.

· Standard boilerplate language has been developed for this plan. This standard language is written in black font and may be modified with permission from the OSI Project Management Office (PMO). Additional information may be added to the boilerplate language sections at the discretion of the project without PMO review.

· Hyperlinks are written in blue underlined text. To return to the original document after accessing a hyperlink, click on the back arrow in your browser’s toolbar. The “File Download” dialog box will open. Click on “Open” to return to this document.

 

Table of Contents

1 Introduction. 1

1.1 Purpose. 1

1.2 Scope. 1

1.3 References. 1

1.3.1 Best Practices Website. 1

1.3.2 Project Centralized Document Repository. 1

1.3.3 External References. 2

1.4 Relationship to Other Components of Project Management Plan. 2

1.5 Document Maintenance. 4

2 Roles and Responsibilities. 4

2.1 Project Office Roles and Responsibilities. 4

2.1.1 Project Director 4

2.1.2 Project Manager 4

2.1.3 Application Development Manager 5

2.1.4 Requirements Analyst 5

2.1.5 Contract Manager 5

2.1.6 Technical Manager 5

2.1.7 Technical Analyst 5

2.1.8 System Engineer/Lead System Developer 5

2.1.9 System Developer Subject Matter Expert 6

2.1.10 Database Administrator 6

2.1.11 Program/Policy Subject Matter Expert 6

2.1.12 User and/or Interfacing IT Organization. 6

2.1.13 User Community Representative/ Subject Matter Expert 6

2.2 Project Stakeholder Roles and Responsibilities. 7

2.2.1 Project Sponsor 7

2.2.2 Project Steering Committee. 7

2.2.3 Office of Technology Services (OTech) Representative. 7

2.2.4 California Technology Agency (CTA) Representative. 7

3 REQUIREMENTS MANAGEMENT PROCESS. 7

3.1 Requirements Definition. 10

3.2 Requirements Initiation. 10

3.3 Requirements Planning. 11



3.4 Requirements Development. 11

3.4.1 Requirements Collection. 12

3.4.2 Requirement Constraints. 13

3.4.3 Requirements Documentation. 13

3.4.4 Requirements Review and Approval 15

3.5 Requirements Baseline. 15

3.6 Requirements Traceability. 16

3.7 Requirements Verification and Validation. 16

3.8 Requirements Change Management. 17

3.9 Requirements as an Input. 17

Appendix A: Acronyms & Abbreviations. A-1

Appendix B: Requirements Checklist – Sample. B-2

 